Walls complete

The block wall is done and Thom has started his waterproofing process... weeping tile around the footing, covered by a healthy 12" of gravel (after the inspector was by to check); parged block wall, rounded at the bottom to encourage water away from the footings; bitumen painted and then a locking membrane pressed in and another layer of bitumen painted over; blue skin on the corners where new joins to old, and finally, a layer of plastic dimpled membrane to provide an air and drainage layer for water that makes it inside to the wall.



Comments

Popular posts from this blog